Down Piluwa Khola Small Hydropower Project is in Sankhuwasava district of Koshi Zone in Eastern Development Region. The project taps the water from the tailrace of project upstream of the settling basin in addition to the diverted flow from Piluwa Khola.  The project site has an installed capacity of generating 10.3 MW power.

 

 Main Components:

 Diversion weir, Intakegravel trap, connecting canal, desander, Collection Pit, head-race canal, forebay tank, headrace pipe, surge tank, penstock pipe, powerhouse, tailrace, switch yard, 33kV transmission line and interconnection facilities required for power evacuation of the project.

Major Jobs:

Ø  Feasibility Study Report (upgrading the capacity of the project from 9.5 MW to 10.3 MW)

Ø  Detailed Design Report

Ø  Design Optimization and upgradation of the power.

Detailed Survey & feasibility Study Report for the 33kV transmission line 

Client Name

River Falls Power Ltd.

Client Company

River Falls Power Ltd.

Project Start Date

Project End Date

Client's Comment

Aayu Consulting Engineers know their business and their approach and manner of doing business works well as a team player with the owners and their other consultants. Aayu Consulting Engineers I might add knows their business well and as such can in many cases lend their expertise to the Districts Management Team and in that position improve the success of a project to the benefit of the district.”