Status of Project: Completed

Client: Siuri Nyadi Power Ltd.

Super Nyadi Hydro power Project is located at Lamjung District in Western Development Region of Nepal being developed by Siuri Nyadi Power Pvt. Ltd. It is a run-off-river (ROR) with installed capacity of 42.27 MW with the net head of 685.51m and design discharge of 7.34 m3/s at Q40 including the additional discharge from two tributaries.

 

Main Components:

Headworks, gravel trap, surface desander,drop intakes (2nos ) Headrace tunnel (6.904 Km), adits, surgetank, drop shaft, underground powerhouse, tailrace tunnel, access tunnel, 132kV transmission line

 

Major Jobs:

Ø  DPR

Ø  Feasibility Report for Project (Capacity Upgrade from 40MW to 42.27MW)

Ø  Feasibility Report of Transmission line

Ø  Power upgrade from 40MW to 42.27MW

 

Client Name

Siuri Nyadi Power Ltd.

Client Company

Siuri Nyadi Power Ltd.

Project Start Date

Project End Date

Client's Comment

Aayu Consulting Engineers are best in the field of hydropower engineering and construction. They have the best team of professionals and Engineers which is best for us in the efficiency and completion of projects.